In 2018, STG Pacific performed the third largest mass concrete placement conducted in Alaska and the largest placement by a single supply source batched onsite in a remote and logistically complex location. The concrete pour was part of the construction of a Long Range Discrimination Radar Equipment Shelter (LES) foundation at Clear Air Force Station,… Read More
STG Pacific completes a fast track Design-Build contract in near record time
STG Pacific completed the fast track Design-Build of two 60+ year-old wooden railroad bridges (85 ft and 50 ft in length) and upgraded the railroad infrastructure that brings in the aircraft fuel needed to support the Beale AFB mission. STG Pacific completed the demolition of existing bridges and new bridge construction in less than 80… Read More
STG begins construction for the USFWS laboratory dedicated to crimes against wildlife
STG Pacific was awarded a prime contract to build a new annex to the Morphology Center for the U.S. Fish & Wildlife Service (FWS). Our scope involves VE and construction of a two-story, 14,500 sf building adjacent to the existing Forensics Laboratory in Ashland, Oregon. The building addition is a specialty use facility with two… Read More